Process factory
How We Work

From sketch to shelf.
One factory, one promise.

Vertically integrated manufacturing — every step from design to dispatch happens under our roof. No outsourcing, no offshoring, no surprises.

30–45

Day lead time

5,000

Pcs daily output

10-pt

QC per piece

100%

In-house

Design & Concept
01

Step 01

Design & Concept

Tech-pack ready in 5 working days.

Every product starts with retail data — not gut feel. Our design team works with you to translate your category target into a tech-pack that includes fabric specs, construction details, measurements, and colour palette. We turn briefs into bulk-ready production files in 5 working days.

What you get

  • Style tech-pack
  • Spec sheet
  • Pattern files
  • Costing breakdown
Fabric & Cutting
02

Step 02

Fabric & Cutting

Mill-direct fabric. Zero-waste CAD cutting.

We source premium denims, twills, and knits directly from trusted mills — no middlemen, no compromise. Fabric arrives, gets inspected against your tech-pack specs, then enters CAD-marker cutting. This step alone saves 8-12% in fabric vs. manual cutting.

What you get

  • Mill-direct sourcing
  • Fabric inspection report
  • CAD marker file
  • Cut bundles ready for line
Production
03

Step 03

Production

250+ skilled hands. 5,000 pcs daily.

Cut bundles enter our stitching floor where 250+ trained operators run multiple lines in parallel. Each line is supervised, with hourly output tracking and inline QC. We can move 5,000 pieces daily across categories — enough to handle multi-SKU bulk PO timelines comfortably.

What you get

  • Operation breakdown
  • Inline QC at every checkpoint
  • Daily output reports
  • Photo updates on request
Quality Check
04

Step 04

Quality Check

10-point QC. Every piece, before pack.

Every garment passes through a 10-point inspection before it reaches packing: fabric integrity, stitch density, seam strength, fit measurement, finish quality, trim alignment, wash quality, label placement, packaging quality, and final visual. We reject before we ship — not after you complain.

What you get

  • 10-point QC sheet
  • AQL inspection report
  • Defect rejection log
  • Final QC clearance
Dispatch
05

Step 05

Dispatch

30–45 days. Shipped to buyers across India, every order.

Approved garments are tagged, folded, and packed to your retail spec — hanger-ready or polybag, MRP-tagged or RFD. Dispatched to buyer warehouses across India with tracking. Export consignments include all standard compliance documentation.

What you get

  • Retailer-spec packing
  • Pre-loaded MRP tags
  • Tracking docket
  • Export-ready documentation
Production Timeline

30–45 days, end-to-end.

D-0

PO + Advance

D-5

Tech-pack lock

D-10

Fabric in-house

D-25

Production complete

D-30/45

Dispatch

Want to see the floor?
We can arrange a video walk-through.